Feb 22, 2020
Spar
- (3 hours)
Category: Fuselage
Sanded interior by the spar, glued the foam parts between the engine and gear bulkheads to make up the torsion box. Filled and did glass layups on the aft side of the engine bulkhead where the spar meets the bulkhead (each side).